gallery - Current systems

 
 

Driveway Aquifer - Prep begins

Driveway Aquifer - sand is placed before liner

Driveway Aquifer - Firestone pond liner is laid out
Driveway Aquifer - Structural gravel placed over liner; replaces road base, filters and "holds" the water: 40% poracity

Driveway Aquifer - Gravel is graded

Driveway Aquifer -Lliner covers the gravel, and driveway is prepped with steel for concrete pour
Driveway Aquifer -David Lewis and owner survey progress
Driveway Aquifer - Water level and pump access thru this pipe


 
 
home